Rumble in the Jungle
Project |
Power Improvement for Large Brewery |
Location |
Kinshasa, Democratic Republic of Congo, Africa |
Industry |
Food manufacturing |
Application |
Commercial and industrial |
Brief |
MSP were commissioned to build 2 power conversion systems to improve the power quality of a major brewery located in Kinshasa DRC. Utilising the Flex-ESS500 5millisecond response time the system was designed to pick up and respond to fluctuations in the grid that would be missed by conventional equipment. |
Specification |
|