Dynamic Containment

energy-trading.jpg

Project

Dynamic Containment

Location

Greater Manchester, UK

Industry

Manufacturing

Application

EV Charging Infrastructure

Brief

MSP sign an agreement with a developer to deploy 40 MWh 40 MW Flex-ESS1000. on a site with a tight footprint flex-ESS1000 will be deployed in Q3 of 2021. Operating in multiple merchant markets, the Flex-ESS1000 allows the developer to fully take advantage of revenue stacking.

Specification

  • 10 x Flex-ESS1000

  • 10 MWh of Kore Mark1 ESS

Previous
Previous

Renewable Colocation on Large Arable Farm

Next
Next

Rumble in the Jungle