College’s 2030 Carbon Zero Pledge
Project
|
Gloucester Colleges - Carbon Zero Project |
Location |
Gloucestershire, UK |
Industry |
Education |
Application |
Colocation/Dynamic Containment/Carbon Footprint Reduction |
Brief |
To build and supply two 1MWp/1,040kWh battery solutions. To reduce the carbon footprint on two different campuses and to reach their goal of net zero. The batteries will be used for dynamic containment.
The battery will have a single internal operations controller and a single GRP IP64 enclosure will house the suite of batteries, HVAC and controller(s).
|
Specification |
-
Flex-ESS1000 to each location
-
1 MWp charge/discharge
-
1040 kWh storage
-
External Inverter
-
1040 KWh of Kore Mark 1 Batteries
-
Existing renewables, 600kWp solar panels supplied by Evoenegy
|