Renewable Colocation for Household & Waste Recycling Centre
Project
|
Colocation for Household & Waste Recycling Centre |
Location |
Swindon, UK |
Industry |
Commercial |
Application |
Energy Cost Reduction |
Brief |
To build and supply a single 500kWp/832kWh battery solution. The battery will be used for storing energy created form local AC coupled solar PV system and distribute it to the private LV network where AC coupled EV chargers will utilise the power. The battery will have a single internal operations controller provided by MSP and a single system power management controller which will be supplied by others.
A single GRP IP64 enclosure will house the suite of batteries, inverter, transformer, HVAC and controller(s).
|
Specification |
|