Brief

To build and supply a single 500kWp/832kWp battery solution. The battery will be used for storing energy created form local AC coupled solar PV system and distribute it to the private LV network where AC coupled EV chargers will utilise the power. The battery will have a single internal operations controller provided by MSP and a single system power management controller which will be supplied by others. A single GRP IP64 enclosure will house the suite of batteries, inverter, transformer, HVAC and controller(s).

Specification

  • Flex-ESS500

  • 500 kWp charge/discharge

  • 832 kWh storage

  • Internal Inverter

  • 832 KWh of Kore Mark 1 Batteries

  • Existing renewables, AC coupled solar PV

Previous
Previous

Currently in Build: Domestic Solar Storage with Reduction in Grid Reliance

Next
Next

Renewable Colocation for Household & Waste Recycling Centre