Brief |
MSP have been commissioned to build and supply a single 50kWp/140kWh 3 phase battery solution. The battery will be used for storing energy created from a 60kWp solar PV array via DCDC optimizers. The system will be AC grid tied to allow import for when the PV is insufficient to supply power to local loads, and export (surplus PV) when local energy demand is low. A new 3 phase grid connection has been arranged by MSP on behalf of the customer. A single internal operations controller will allocate powered where needed and manage the internal operation of the BESS.
A single custom colour GRP IP64 enclosure will house the suite of batteries, inverter, internal HVAC and controller.
|
Specification |
|